GIS for National Highway Toll Optimization: Mapping India’s Move from GNSS Tolling to Barrier-Free Toll Collection

GNSS tolling depends on Geographic Information System (GIS) technology to turn a vehicle’s satellite position into a distance travelled on a mapped highway, and that distance into a fair toll. While satellite-based tolling remains under deliberation in India, the government is expanding barrier-free toll collection through the Multi-Lane Free Flow (MLFF) tolling system on selected National Highways. GIS can support both approaches by providing geo-referenced highway maps, plaza locations, and spatial insights that help highway agencies monitor infrastructure and manage traffic operations.

Introduction: Why India Is Rethinking How Highway Tolls Are Collected

Toll collection on India’s highways runs at a large scale. According to the Press Information Bureau (PIB), there are over 1,150 fee plazas on National Highways and Expressways, FASTag penetration is over 98 percent, and user fee collection at fee plazas reached ₹61,408.15 crore in FY 2024-25. FASTag has made India’s electronic toll collection system largely cashless, but vehicles still have to slow down at each plaza, and toll plaza waiting time remains a daily concern on busy corridors.

That is starting to change. In May 2026, the National Highways Authority of India (NHAI) launched the country’s first MLFF tolling system at the Chorayasi Toll Plaza in Gujarat, where vehicles pay without stopping. Behind this shift, and behind the satellite tolling pilots that came before it, sits one common need: an accurate, current picture of the highway network.

What Is GNSS-Based Tolling and How Is It Different from FASTag?

GNSS-based tolling uses a Global Navigation Satellite System (GNSS) On-Board Unit (OBU) in the vehicle to record where it travels. The system matches these positions to a geo-referenced map of the highway, a process known as map matching, and charges for the actual distance covered. This is why GNSS tolling is also called distance-based or satellite-based toll collection.

FASTag works differently. The fee is charged when a vehicle passes a toll plaza, at the rate set for the section that plaza covers. FASTag therefore depends on physical plazas, while GNSS tolling depends on the map and the vehicle’s position on it.

Another approach to toll collection is barrier-free tolling. Under the ANPR-FASTag model, Automatic Number Plate Recognition (ANPR) cameras work alongside FASTag-based electronic toll collection to identify vehicles as they pass through the toll point, so there is no physical barrier to stop at. This is the model India is now rolling out on selected stretches, while GNSS tolling remains under deliberation.

India’s Tolling Timeline: GNSS Pilots, the 2024 Fee Rules, and the Shift to Multi-Lane Free Flow

In June 2024, Indian Highways Management Company Limited (IHMCL), a company promoted by NHAI, invited Expressions of Interest for GNSS-based Electronic Toll Collection. Pilot studies for GNSS-based user fee collection were also carried out on the Bengaluru-Mysore section of NH-275 and the Panipat-Hisar section of NH-709, as the government informed Parliament in 2024.

In September 2024, the government amended the National Highways Fee (Determination of Rates and Collection) Rules to prepare for GNSS-based fee collection. Under the amendment, vehicles other than National Permit vehicles with a working GNSS OBU can travel up to 20 kilometers in each direction in a day without a fee. Plazas can also earmark an exclusive lane for vehicles with a valid, functional GNSS OBU.

In March 2025, the Ministry of Road Transport and Highways (MoRTH) told the Rajya Sabha that its Apex Committee and High-Level Empowered Committee had recommended further deliberations on satellite tolling, citing security and privacy considerations and overall operational control. The reply also noted that, with the existing features of NavIC, India’s regional navigation satellite system, satellite tolling would need additional satellite constellations and suitable receivers to reach the desired positional accuracy.

In April 2025, MoRTH clarified that no decision had been taken to launch satellite-based tolling nationwide from 1 May 2025. It added that an ANPR-FASTag-based barrier-less tolling system would instead be implemented at selected toll plazas.

On 17 March 2026, the National Highways Fee (Determination of Rates and Collection) (Second Amendment) Rules, 2026 came into effect, setting out how unpaid tolls on barrier-free tolling systems are handled through an Electronic Notice (E-Notice). A vehicle owner who receives an E-Notice can pay the normal fee within 72 hours; after that, the fee is charged at twice the normal rate.

The first MLFF tolling system went live in May 2026 at the Chorayasi Toll Plaza on the Surat-Bharuch section of NH-48, where around 41,500 vehicles crossed on the first day. The rollout has continued plaza by plaza. When NHAI introduced MLFF tolling at the Paranur Toll Plaza on NH-179B in October 2026, Tamil Nadu’s first, it listed these earlier MLFF locations: Chorayasi in Gujarat; Mundka-Bakkarwala on UER-II in Delhi-NCR; Shahjahanpur, Daulatpura, and Manoharpura on the Delhi-Jaipur section of NH-48 in Rajasthan; and Gharaunda on NH-44 in Haryana.

The wider network is now being prepared as well. On 6 November 2026, NHAI issued guidelines to standardize the design and infrastructure of toll plazas on four-lane and above National Highways so they can support MLFF-based barrier-free toll collection. The guidelines cover plaza layout, lane configuration, gantries, lighting, signage, and Electronic Variable Message Signs, and they apply to future and under-construction projects. The number of lanes required at a toll plaza has also been rationalized.

Where GIS Fits in Tolling: Geo-Referenced Highway Maps, Distance Calculation, and Plaza Monitoring

Every electronic toll collection system, whether plaza-based, barrier-free, or satellite-based, works on a defined network of highways, toll sections, and plazas. GIS is where that network is mapped, checked, and analyzed, and for distance-based tolling it is essential.

Highway Mapping

The IHMCL Expression of Interest makes precise geo-referenced map making part of the scope of GNSS tolling, with a tentative target of 99.9 percent or more for map making and map matching. New highways must be added to the map within 15 days of notice, so highway mapping keeps pace with the growing network. As more plazas move to the MLFF design, the same map can help agencies place gantries, plan lanes, and track which projects have adopted the new layout.

Distance Calculation and Map Matching

For a distance-based toll, the system must work out which road a vehicle is actually on. This is hardest where two roads run close together, and the Expression of Interest gives the example of an elevated main highway with a service road running beside it. If the system confuses the two, a vehicle using only the service road could be charged a highway toll, so accurate map matching is what keeps each toll fair. Linear referencing, which locates assets and events by their distance along a route, gives highway agencies a consistent way to define toll sections. It also gives them a reliable way to measure the distance travelled on each section.

Toll Plaza Waiting Time Monitoring

Plazas are fixed points on the network, which makes them easy to map and compare. Waiting time, queue length, and vehicle speed at each plaza become location data that shows where congestion builds and when, much like the spatial analytics used to manage traffic congestion in Indian cities.

Annual Pass Patterns

The FASTag Annual Pass, introduced on 15 August 2025 for eligible non-commercial vehicles with a valid FASTag, covers one year or 200 plaza crossings, whichever comes first. It was priced at ₹3,000 at launch and revised to ₹3,075 from 1 April 2026. By September 2026, more than one crore passes had been issued, according to MoRTH. Mapped by plaza, pass usage can show which corridors carry the most regular commuters.

How ArcGIS Velocity and ArcGIS Enterprise Support Real-Time Toll Operations

Real-time tolling generates a continuous stream of FASTag transaction records, ANPR vehicle detections, and operational alerts. ArcGIS technology can help turn this data stream into a live operational picture for a toll management system.

Ingesting Live Data

ArcGIS Velocity is a cloud-native add-on capability for ArcGIS Online. It can ingest data from Internet of Things (IoT) platforms, message brokers, and third-party APIs, such as feeds from plaza sensors or vehicle units.

Tracking and Geofencing

ArcGIS Velocity offers real-time asset tracking and dynamic geofencing. A geofence can be drawn around a plaza or a highway section, so the system flags when traffic inside it slows down or a queue grows beyond a set length.

Alerts and Dashboards

These events can be pushed as alerts to operations teams. ArcGIS Dashboards can then bring plaza status, traffic flow, and alerts onto one screen, giving operators the real-time view that an intelligent traffic management system (ITMS) depends on.

A Shared Data Foundation

ArcGIS Enterprise can serve as a central, governed platform for highway and plaza data, so highway alignments, plaza locations, and toll sections are kept in one place and shared with every team that needs them. ArcGIS Roads and Highways adds linear referencing on top of this data, keeping toll sections, chainages, and assets consistent as the network changes.

Analyzing History at Scale

Tolling data grows quickly, and many patterns only appear over months. ArcGIS GeoAnalytics Server can process large volumes of historical records to reveal seasonal peaks, recurring congestion, and long-term changes in traffic. Highway agencies can explore Roads and Highways industry solutions from Esri India to plan similar real-time views for their own networks.

Highway Data in Practice: NHAI Monitoring Tools and Esri India Road Network Examples

In September 2024, NHAI announced that IHMCL had developed GIS-based software for real-time monitoring of toll plaza waiting time. Around 100 plazas were selected first, based on congestion feedback received through the 1033 National Highway helpline. The software shows live queue length in meters, total waiting time, and vehicle speed at each plaza. When a queue exceeds the prescribed limit, it also sends a congestion alert and a lane distribution recommendation.

Road inventory matters just as much, because every toll section sits on a road that has to be mapped first, which is where GIS for road and highway planning begins. The Tamil Nadu Highways Department (TNHD) built its e-Pathai GIS on Esri’s ArcGIS Server technology, covering about 60,000 kilometers of road network. It is linked with the department’s road maintenance management system (TNRMMS) and its project and finance management system, and it gives officials and the public a shared view of roads, bridges, and projects.

“The ArcGIS platform’s extensive capability has helped us to rationalize our decision making in planning, programming, funding, and allocation of resources. It has allowed us to make the best use of public funds to preserve the road networks at an acceptable level of serviceability.”

Er. K. Visalakshi, then Chief Officer (IT), TNHD

A single authoritative road map like this is the foundation that any distance-based or barrier-free tolling system needs. Transportation and National Government solutions from Esri India support this kind of network-wide road data.

Challenges and the Road Ahead

Positioning Accuracy

Distance-based tolling is only as fair as the position it records. Satellite signals can weaken near tall structures and under flyovers, which can place a vehicle on the wrong road. MoRTH noted in March 2025 that satellite tolling would need additional satellite constellations and suitable receivers to reach the desired accuracy.

Privacy and Security

A GNSS system records where a vehicle travels, not just where it pays. MoRTH’s committees cited security and privacy considerations when they recommended further deliberation on satellite tolling. Any future system will need clear rules on who holds location data, how long it is kept, and how it is protected.

Map Matching on Complex Roads

Elevated carriageways, service roads, and interchanges often run side by side, and a toll system must tell them apart every time. The 99.9 percent target in the IHMCL Expression of Interest shows how high the bar is. Keeping the highway map current as new roads open is continuous work.

A Mixed Network During Rollout

MLFF tolling is expanding plaza by plaza, so barrier-free and conventional FASTag plazas will operate side by side for some time. Enforcement through E-Notices depends on accurate vehicle and number plate records. Mapping where each system is live helps operators plan and lets road users know what to expect on each corridor.

For the millions of people who use National Highways every day, these changes mean shorter waits, fewer stops, and tolls that match the road they actually used. Whether India’s next step is wider barrier-free toll collection or satellite tolling, each step depends on a highway map that is accurate, current, and shared across every agency involved.

FAQs

1.What is GNSS-based toll collection in India?

GNSS-based toll collection uses an On-Board Unit in the vehicle to record its position through satellite navigation. The toll is calculated on the distance traveled on the mapped highway, instead of a fixed fee at a plaza.

2.Has satellite-based tolling started on Indian National Highways?

No, satellite-based tolling remains under deliberation. Instead, ANPR-FASTag barrier-less tolling is being implemented at selected plazas, with the first MLFF system going live in May 2026.

3.What is an MLFF tolling system?

A Multi-Lane Free Flow (MLFF) tolling system lets vehicles pay without stopping, using ANPR cameras and FASTag-based electronic toll collection to identify them as they pass. India’s first MLFF system started at the Chorayasi Toll Plaza in Gujarat in May 2026, and it has since been introduced in Delhi-NCR, Rajasthan, Haryana, and Tamil Nadu.

4.What happens if a vehicle does not pay at an MLFF toll plaza?

The vehicle owner receives an E-Notice and can pay the normal fee within 72 hours. After that, the fee is charged at twice the normal rate.

5.What is ANPR in toll collection?

Automatic Number Plate Recognition (ANPR) uses cameras to read a vehicle’s number plate. In barrier-free toll collection, it works with FASTag to confirm which vehicle passed and charge the correct fee.

6.How does GIS help in highway toll management?

GIS builds and maintains the geo-referenced highway maps that distance-based tolling depends on. It also maps plaza locations, queue lengths, and waiting times, so operators can monitor congestion in real time.

7.What is the FASTag Annual Pass?

The FASTag Annual Pass covers one year or 200 plaza crossings, whichever comes first, for eligible non-commercial vehicles with a valid FASTag. It launched on 15 August 2025 at ₹3,000 and was revised to ₹3,075 from 1 April 2026.

Written by

Esri India Marketing

Next Article

GIS Day 2026: Celebrating 30 Years of GIS in India with Esri India

Read this article