GIS for Space Economy: Mapping India's Satellite Launch Site Suitability

Satellite launch site suitability in India is the process of deciding where a rocket can lift off safely and efficiently, based on factors such as latitude, launch direction, distance from populated areas, terrain, and access. Geographic Information System (GIS) technology brings these factors onto one map. India’s second spaceport at Kulasekarapattinam shows how much a site’s location shapes what a rocket can carry.

Introduction: Why Location Is the First Decision in India’s Launch Economy

The same rocket can carry very different loads depending on where it lifts off. According to the Department of Space, India’s Small Satellite Launch Vehicle (SSLV) can carry about 300 kg to a Sun-synchronous polar orbit from Kulasekarapattinam in Tamil Nadu. From Sriharikota, its capability for the same orbit is inadequate for a useful payload.

That difference matters as India’s space economy grows. IN-SPACe’s Decadal Vision puts the Indian space economy at USD 8.4 billion in 2022, with the potential to reach USD 44 billion by 2033, about 8 percent of the global market. With only a few launch sites in the country, each site decision shapes how much of that growth India’s launch sector can serve.

What Is Launch Site Suitability Analysis?

Launch site suitability analysis is the study of which locations can support rocket launches safely, efficiently, and at a reasonable cost. It compares candidate areas against a set of criteria and ranks them by how well they meet those criteria together.

The criteria are largely geographic. A site needs a launch direction, or azimuth corridor, that sends the rocket over the sea rather than over towns. It needs enough distance from populated areas to keep a safety zone around the pads. Nearness to the equator helps eastward launches, while a clear path to the south helps polar launches.

Terrain, land availability, road and port access, and space for supporting facilities also count. Each of these factors can be mapped, scored, and compared, which makes launch site selection a natural fit for GIS-based multi-criteria analysis.

The same approach is already used for other infrastructure. Esri India has shown how suitability modelling works for solar farm site selection, and launch sites follow similar logic with stricter safety rules.

India’s Launch Sites: Sriharikota, Kulasekarapattinam, and the Third Launch Pad

Sriharikota is home to Satish Dhawan Space Centre (SDSC), previously known as Sriharikota Range (SHAR). According to SHAR, the site was chosen for its location on the East Coast far from populated areas, a good launch azimuth corridor for various missions, nearness to the equator that benefits eastward launches, and a large uninhabited area for a safety zone. It covers about 43,360 acres, and in March 2026 the Department of Space confirmed that two launch pads there are operational.

Kulasekarapattinam, a coastal village in Thoothukudi district, Tamil Nadu, is India’s second launch site. The foundation stone for the SSLV Launch Complex was laid on 28 February 2024. As of 31 July 2025, ₹985.96 crore had been allocated to the project, with ₹389.58 crore used, according to a Department of Space reply in the Lok Sabha, and land acquisition was complete except for the land needed to reroute the East Coast Road.

In March 2026, the Department of Space said the site is expected to be commissioned in FY 2026-27, with SSLV launches from it expected in the 2027-28 timeframe. The site is meant primarily for SSLV launches and for the launch activities of Non-Government Entities (NGEs).

The Third Launch Pad will be built at Sriharikota. The Union Cabinet approved it on 16 January 2025 at a cost of ₹3,984.86 crore, with a target of 48 months, to serve ISRO’s Next Generation Launch Vehicles and act as a standby for the Second Launch Pad. In March 2026, it was described as targeted for the 2029-30 timeframe. The Department of Space also stated that it has no proposal to set up any other launch site in the country.

Why Kulasekarapattinam: Polar Launch Trajectories, Payload, and Safety Zones

The answer to why India needed a second launch site lies in the direction rockets travel. From India, reaching a polar orbit means launching toward the south.

According to the Department of Space, launches to Sun-synchronous polar orbits from Sriharikota need the rocket to maneuver so that spent stages do not fall over landmasses. This maneuvering significantly reduces payload capability. For a small rocket like the SSLV, the loss is large enough to make the payload inadequate for a useful mission.

Kulasekarapattinam avoids this problem. ISRO describes the site as enhancing payload capability through its direct southward launch trajectory for small launch vehicles. The result is a payload of about 300 kg to a Sun-synchronous polar orbit for the SSLV, a rocket designed to launch satellites of up to 500 kg into Low Earth Orbit (LEO).

Zoning and Safety

Site planning continues inside the boundary. ISRO grouped the facilities into different zones based on functional requirements and local terrain. When the RH200 sounding rocket was launched from the new complex in February 2024, its launch facilities were laid out within the SSLV facilities while following strict safety distance criteria.

Range Safety at Sea

Range safety extends beyond the land boundary to the sea. ISRO has planned coastal boat patrolling at Kulasekarapattinam for this, similar to Satish Dhawan Space Centre SHAR.

How GIS Assesses Launch Site Suitability: Criteria, Layers, and Weighted Overlay

GIS turns each suitability factor into a map layer, then combines the layers to show which areas meet the most criteria.

Defining the Criteria

The process starts with the factors that matter most, such as latitude, a launch corridor over the sea, distance from settlements, terrain, land use, and access, each mapped as a separate layer.

Building the Base Layers

Indo ArcGIS Living Atlas provides access to Bhuvan thematic maps, including land use and land cover classifications. These layers help identify built-up areas, farmland, forests, and open land around candidate sites.

Adding Imagery

ArcGIS Image Server can host and analyze satellite imagery and elevation data for the coastline and nearby land, showing current settlements, roads, and land cover. Esri India’s blog on NISAR and infrastructure monitoring explains how new satellite data adds to this picture.

Weighted Overlay

ArcGIS Spatial Analyst supports finding suitable locations based on criteria such as environment and terrain. In a weighted overlay, each layer is scored on a common scale and given a weight based on its importance. The layers are then combined in ArcGIS Pro to produce a suitability map that ranks candidate areas.

Safety Zones and Corridors

Buffers around pads and storage areas show how far facilities must sit from each other and from settlements. Launch corridors can be drawn over the sea to check what lies beneath each possible flight path.

Monitoring Site Development

Once a site is chosen, imagery over time can track construction and land use changes around it. Imagery and remote sensing capabilities, along with GeoAI for detecting features in imagery, support this kind of monitoring. Space agencies and planning departments can explore National Government solutions from Esri India for this kind of site planning work.

India’s Space Economy Push: Indian Space Policy 2023, IN-SPACe, and Private Launch Providers

India has opened its launch sector to private companies in stages. The Indian Space Policy 2023 provides for NGEs to use spaceports for launch activities, subject to technical feasibility and range safety constraints. In February 2024, the government allowed up to 49 percent foreign direct investment under the automatic route for launch vehicles and for creating spaceports.

Private launches have followed. Skyroot Aerospace’s suborbital rocket Vikram-S lifted off on 18 November 2022 from the sounding rocket launch complex at Sriharikota, the first launch of a rocket built by a private company in India. On 30 May 2024, Agnikul launched Agnibaan SOrTeD from “Dhanush”, India’s first private launch pad.

On 18 July 2026, Skyroot’s Vikram-I lifted off from Sriharikota and placed two satellites in Low Earth Orbit, making Skyroot the first private company to launch to orbit from Indian soil. The Department of Space has also described Kulasekarapattinam as a site that will support greater private sector participation in launch operations.

Challenges and the Road Ahead

Coastal Activity Near Launch Corridors

Coastal launch sites share the sea with boats and other everyday coastal activity. Range safety depends on keeping the area under the flight path clear during launches, and ISRO has planned coastal boat patrolling at Kulasekarapattinam for this. Mapping coastal activity and launch corridors together helps plan launch windows with the least disruption.

Land and Road Changes

A launch site affects more than its own boundary. At Kulasekarapattinam, land acquisition was complete except for the land needed to reroute the East Coast Road. Planning such changes needs a clear view of land parcels, roads, and settlements on one map.

Long Build Timelines

Launch infrastructure takes years to complete. Kulasekarapattinam is expected to be commissioned in FY 2026-27, and the Third Launch Pad is targeted for 2029-30. Tracking progress across many facilities and contracts is easier when each one is linked to its location.

Limited Sites for a Growing Market

India currently has two operational launch pads at Sriharikota, with Kulasekarapattinam and the Third Launch Pad still to come. As more private companies build rockets, demand for launch slots and pads will grow. Site planning will need to balance government missions, private launches, and safety requirements across a small number of locations.

India’s launch economy will grow only as fast as its launch sites allow. Every pad, corridor, and safety zone starts as a decision about location, and GIS makes those decisions clearer by bringing land, sea, people, and terrain onto one map.

FAQs

1.Why was Kulasekarapattinam chosen for India’s second spaceport?

Kulasekarapattinam allows a direct southward launch path for polar orbits, so rockets do not need to maneuver to avoid dropping spent stages over land. This lets the SSLV carry about 300 kg to a Sun-synchronous polar orbit.

2.What factors decide a satellite launch site’s suitability?

Key factors include nearness to the equator, a launch corridor over the sea, distance from populated areas, and space for a safety zone. Terrain, land availability, and access to roads and ports also matter.

3.How is GIS used in launch site selection?

GIS turns each suitability factor into a map layer and combines the layers through weighted overlay to rank candidate areas. It also helps plan safety zones, launch corridors, and the layout of facilities within a site.

4.When will the Kulasekarapattinam spaceport be operational?

As of March 2026, the Department of Space expected the site to be commissioned in FY 2026-27. SSLV launches from Kulasekarapattinam are expected in the 2027-28 timeframe.

5.Can private companies launch rockets from Indian spaceports?

Yes. The Indian Space Policy 2023 allows Non-Government Entities to use spaceports for launch activities, subject to technical feasibility and range safety constraints.

Written by

Esri India Marketing

Next Article

GIS for National Highway Toll Optimization: Mapping India’s Move from GNSS Tolling to Barrier-Free Toll Collection

Read this article